Cassady Avenue Roadway Safety Improvements - Delmar Drive to 7th Avenue

Share Cassady Avenue Roadway Safety Improvements - Delmar Drive to 7th Avenue on Facebook Share Cassady Avenue Roadway Safety Improvements - Delmar Drive to 7th Avenue on Twitter Share Cassady Avenue Roadway Safety Improvements - Delmar Drive to 7th Avenue on Linkedin Email Cassady Avenue Roadway Safety Improvements - Delmar Drive to 7th Avenue link

Cassady Avenue improvements consist of the full reconstruction of the roadway to a 3-lane, curb and gutter section with additional turn lanes at the intersection with E. 5th Avenue. Sidewalk will be placed along the east side and a shared use path along the west side. Additional improvements include traffic signal replacement, street lighting, street trees where feasible, and storm sewer. Electric distribution and water line systems are anticipated to be impacted. The 12" water line between Avalon Place and E. 5th Avenue will be replaced with a new 12" line.

E. 5th Avenue improvements consist of roadway reconstruction with additional turn lanes at the intersection with Cassady Avenue. The sidewalk will be replaced along both sides and lighting and utility systems replaced/relocated as necessary. Additional improvements include street lighting, street trees where feasible, and storm sewer. Electric distribution and water line systems are anticipated to be impacted. The water services from the existing 2" water line between N. Dawson Avenue and Northview Avenue will be transferred to the existing 12" water line and the 2" line abandoned.

Cassady Avenue improvements consist of the full reconstruction of the roadway to a 3-lane, curb and gutter section with additional turn lanes at the intersection with E. 5th Avenue. Sidewalk will be placed along the east side and a shared use path along the west side. Additional improvements include traffic signal replacement, street lighting, street trees where feasible, and storm sewer. Electric distribution and water line systems are anticipated to be impacted. The 12" water line between Avalon Place and E. 5th Avenue will be replaced with a new 12" line.

E. 5th Avenue improvements consist of roadway reconstruction with additional turn lanes at the intersection with Cassady Avenue. The sidewalk will be replaced along both sides and lighting and utility systems replaced/relocated as necessary. Additional improvements include street lighting, street trees where feasible, and storm sewer. Electric distribution and water line systems are anticipated to be impacted. The water services from the existing 2" water line between N. Dawson Avenue and Northview Avenue will be transferred to the existing 12" water line and the 2" line abandoned.

Page last updated: 17 Apr 2026, 02:58 PM